top of page
Anchor 18
105th Park Furnishing Locations

Sobrante Park Neighborhood

Locations 1 - 17

Click on each pin on the map to visit each location

What do you envision for this space?

A video invitation to design together.

Created by Keta Price

​

​

A skatepark? Outdoor art gallery?Outdoor classroom?

​

What types of benches and signs do you want to have here?

​

What types of cultural public art do you want to see here?

Park - Location 1

LOCATION 1:

Specifications (from STAGE 2 70% plans)

2 10’x6’ Tables

Type of footing: C

​

Design and cultural content

EB Parks Design Standard supplied by  community vendor TBD

​

Budget and Timeline

To be announced

Anchor 1

Park - Location 2

LOCATION 2:

Specifications (from STAGE 2 70% plans)

BBQ grills

Type of footing: C

​

Design and cultural content

432 Sq. Multilevel Park and Camp Grill  “The Park and Facilities” or equivalent supplied by community vendor TBD

​

Budget and Timeline

To be announced

Anchor 2
Anchor 3

Park - Location 3

LOCATION 3:

Specifications (from STAGE 2 70% plans)

2 Backless benches

Type of footing: B

​

Design and cultural content

To be announced

​

Budget and Timeline

To be announced

Park - Location 4

LOCATION 4:

Specifications (from STAGE 2 70% plans)

Interpretive sign posts - 2’ OC 3”x3” steel angle irons 30‘“ tall, tops cut at 45⁰ set 2’ into 12”dia. X 3’ deep  concrete footing sloped on top for runoff and set 2” below grade

​

Design and cultural content

Beginning of the "Human History Path" -  the Lisjan Ohlone people

Include link to website & QR code

​

Budget and Timeline

To be announced

Anchor 4

Park - Location 5

LOCATION 5:

Specifications (from STAGE 2 70% plans)

4 Benches (3 bolt-down) oriented N,S,E,W on a 10” radius

Type of footing: A

​

Design and cultural content

Ceremonial Circle

​

Budget and Timeline

To be announced

Anchor 5

Park - Location 6

LOCATION 6:

Specifications (from STAGE 2 70% plans)

2 Seating Stones 

​

Design and cultural content

To be announced

​

Budget and Timeline

To be announced

Anchor 6

Park - Location 7

LOCATION 7:

Specifications (from STAGE 2 70% plans)

4 Bike Racks

​

Design and cultural content

Rack to be  supplied by community vendor & BAAQMD

​

Budget and Timeline

To be announced

Anchor 7

Park - Location 8

LOCATION 8:

Specifications (from STAGE 2 70% plans)

Bench (4 bolt-down)

Type of footing: A

​

Design and cultural content

To be announced

​

Budget and Timeline

To be announced

Anchor 8

Park - Location 9

LOCATION 9:

Specifications (from STAGE 2 70% plans)

3’x6’x 4” concrete pad for a 30”x50”x59” steel storage box to be supplied by community vendor

​

Design and cultural content

Community use storage box

​

Budget and Timeline

To be announced

Anchor 9
Anchor 10
Anchor 12

Park - Location 10

LOCATION 10:

Specifications (from STAGE 2 70% plans)

2 Backless benches

Type of footing: B

​

Design and cultural content

To be announced

​

Budget and Timeline

To be announced

Park - Location 12

LOCATION 12:

Specifications (from STAGE 2 70% plans)

1 Backless bench

Type of footing: B

​

Design and cultural content

To be announced

​

Budget and Timeline

To be announced

Park - Location 11

LOCATION 11:

Specifications (from STAGE 2 70% plans)

Exercise low bars and possible parallel bars and walker TBD by allowable safety  surface to be supplied by community vendor

​

Design and cultural content

To be announced

​

Budget and Timeline

To be announced

Anchor 11
Anchor 13
Anchor 15

Park - Location 13

LOCATION 13:

Specifications (from STAGE 2 70% plans)

2 Backless benches

Type of footing: B

​

Design and cultural content

A bench long enough for a whole family

​

Budget and Timeline

To be announced

Park - Location 15

LOCATION 15:

Specifications (from STAGE 2 70% plans)

1 Bench with back

Type of footing: B

​

Design and cultural content

To be announced

​

Budget and Timeline

To be announced

Park - Location 14

LOCATION 14:

Specifications (from STAGE 2 70% plans)

14’x35’ Grade for permeable pavers

​

Design and cultural content

All-weather concrete pad for vendors

​

Budget and Timeline

To be announced

Anchor 14
Anchor 16
Anchor 17

Park - Location 16

LOCATION 16:

Specifications (from STAGE 2 70% plans)

Entry post - Max. 10’ pole supplied by community vendor

Type of footing: C

​

Design and cultural content

Entry and welcome

​

Budget and Timeline

To be announced

Park - Location 17

LOCATION 17:

Specifications (from STAGE 2 70% plans)

Underground conduit along trail from 105th Ave entry to Datum Point A for future lighting

​

Design and cultural content

To be announced

​

Budget and Timeline

To be announced

© 2020 Brower Dellums Institute for Sustainable Policy Studies. 

bottom of page